LA PORTE, Texas – Commissioner Jack Morman announced the start of construction on Choate Road for Monday, November 6th. The $4.7 million project will reconstruct and realign the existing road to a four-lane concrete roadway from Highway 146 to Bay Area Boulevard.

Two-way traffic will be maintained at all times throughout the duration of construction. Drivers are reminded to drive through the area with caution, or use alternate routes, if possible. Construction is expected to be complete in the third quarter of 2018.

Be sure to follow the “Harris County Precinct 2” Facebook page for more information and updates on the Precinct.